Three-phase post-construction cleanup: rough, final, and detail. We close out the construction phase so you can open the doors on schedule.

The Program

The handoff between trades and operations.

Post-construction cleanup is where projects lose a week. The trades are done, the punchlist is closing, but the building is full of dust, debris, and adhesive residue. We close that gap on a dedicated crew, often working in parallel as the final trades finish.

By the time you walk through, the building is operating-ready, not just construction-finished.

  • Rough cleanAfter framing and rough trades. Debris removal, vacuum, and initial sweep before finishes go in.
  • Final cleanAfter cabinets, paint, and fixtures. Window track cleanup, dust removal, fixture polishing.
  • Detail cleanPre-walkthrough perfection. Adhesive residue, paint overspray, fixture polish, floor protection removal.
  • Floor protection managementStrip and dispose of protective film, paper, and ramboard. Floors revealed and final-polished.
  • Glass and window detailConstruction debris removed from glass, frames, and tracks. Including high windows by lift.
  • Punchlist coordinationWe track and close cleaning-related punchlist items with your GC or PM.
Process

How it works.

Pre-walk

We meet with the GC, walk the building, and write a phase-by-phase scope.

Rough phase

Crew arrives after structural and rough trades complete. Debris and gross dust removed.

Final phase

Coordinated with finish trades. Cabinets, fixtures, and surfaces cleaned to detail.

Detail and turnover

Punchlist closeout, final polish, floor protection removal, ready-for-walkthrough handoff.

Why It Matters

Why post-construction cleaning matters.

Construction dust is the single most common cause of post-renovation operational issues: HVAC fouling, indoor air complaints, surface damage from improper cleanup. A proper post-construction program prevents all three and shortens the move-in timeline.

Post-construction cleaning available throughout Sacramento Region.

Frequently Asked

About post-construction cleaning.

Rough clean is post-framing debris removal. Final clean is post-finishes deep clean. Detail clean is the pre-walkthrough perfection pass.

Yes. HEPA vacuums, lifts, scaffolding rentals, and all consumables are included in our scope.

We can typically mobilize a crew within 48 to 72 hours of contract sign. For larger projects, we recommend pre-booking.

Yes. We work directly with GCs and PMs, attend OAC meetings if needed, and track our scope against the project schedule.

Ready to talk?

Tell us about your facility. We'll respond within 24 hours with a transparent, line-item quote.